Campbell-scientific CPEC200 Closed-Path Eddy-Covariance System Manuel d'utilisateur Page 108

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 112
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 107
Appendix H. CPEC200 Pump Replacement
FIGURE H-6. Self-tapping screws attaching pump to metal box
8. Cut the blue (inlet) and red (outlet) tubing on each side of the pump
behind the barbed connector as shown in FIGURE H-7.
FIGURE H-7. Location of cuts to remove pump assembly from tubing
9. Remove the pump from the assembly.
H.3 Installation
To reinstall a CPEC200 pump, carry out the following steps:
1. Position the pump with the label up and connect the coiled tubing on
both sides of the pump (see FIGURE H-8). Blue tubing connects the
inlets and red connects the outlets as directional arrows show on the
side of the pump (FIGURE H-9).
H-4
Vue de la page 107
1 2 ... 103 104 105 106 107 108 109 110 111 112

Commentaires sur ces manuels

Pas de commentaire